Design
and construction
of oil and gas
facilities
Services
- Offshore
- Industrial facilities
- Specialized Works and Services
Learn more
- 01 /Design and Engineering02 /Marine engineering surveys03 /Installation of Offshore Facilities (Offshore Fixed Platforms, Single Point Mooring Systems)04 /Piling Arrangement05 /Fabrication of structures and process facilities of offshore fixed platforms, terminals, and production systems06 /Diving and Underwater Technical Works07 /Power Supply Systems and Generating Facilities Installation and Commissioning08 /Steel tanks, pipelines installation, Process Equipment Installation and Piping09 /Instrumentation Systems Installation and Commissioning10 /Subsea pipelines and subsea cable systems installation11 /Protective Enclosure Structures for Oil & Gas and Energy Facilities
- Offshore
- Onshore
- Design and engineering
- Specialized works and services
Offshore Transportation and Installation of Wellhead Platform-1 (Ice-Resistant Fixed Offshore Platform), D33 FieldLocation: Baltic SeaYear: 2026
Reactivation and Restoration to Operational Condition of the Breeze Jack-Up Drilling RigLocation: Krasnye Barrikady production yard, Astrakhan Region (Ikryaninsky District); Caspian SeaYear: 2025
Marine Operations for the Float-Out from Dry Dock, Transportation and Installation of Process Trains No. 1 and No. 2 of the NOVATEK-Murmansk Plant (Arctic LNG 2 Project)Location: Barents Sea, Kara Sea, Gulf of ObYear: 2024
Construction of two 4000 m³ VSTs in the area of Tengiz oil and gas fieldLocation: KazakhstanYear: 2007
Offshore Transportation and Installation of Wellhead Platform-1 (Ice-Resistant Fixed Offshore Platform), D33 FieldLocation: Baltic SeaYear: 2026
Offshore Transportation and Installation of Wellhead Platform-1 (Ice-Resistant Fixed Offshore Platform), D33 FieldLocation: Baltic SeaYear: 2026
Reactivation and Restoration to Operational Condition of the Breeze Jack-Up Drilling RigLocation: Krasnye Barrikady production yard, Astrakhan Region (Ikryaninsky District); Caspian SeaYear: 2025
Marine Operations for the Float-Out from Dry Dock, Transportation and Installation of Process Trains No. 1 and No. 2 of the NOVATEK-Murmansk Plant (Arctic LNG 2 Project)Location: Barents Sea, Kara Sea, Gulf of ObYear: 2024Gallery
Contacts
Full company name
CNGS Engineering Ltd
CNGS Engineering LLC
CNGS Engineering LLC
Phone
+7 (495) 280-13-25
E-mail
info@cngsengineering.ru
Working hours
Mon-Fri, 10:00-18:00
Address
Moscow, Victoria Business Center,
Nizhnyaya Krasnoselskaya St., 35, bldg. 64, office 618
Get directions
Nizhnyaya Krasnoselskaya St., 35, bldg. 64, office 618
Phone
+7 (495) 685-93-47
E-mail
info-astr@cngsengineering.ru
Working hours
24/7
Address
Astrakhan,
Neftyanikov Sq., 2
Get directions
Neftyanikov Sq., 2


